Inspirepac, Wetherby

Case study

Inspirepac, Wetherby

  • Project:
    Inspirepac Wetherby
  • Client:
    Smurfit Kappa
  • Sector:
    Commercial
  • Service:
    M&E
  • Value:
    £500k
  • Duration:
    22 weeks
A major fire destroyed the UK’s Smurfit Kappa Inspirepac production facility in North Yorkshire
The multimillion pound turnover, FTSE100 packaging company needed full Mechanical and Electrical refurbishment (M&E) to bring the product range back into production as quickly as possible.
Services included:
  • Project management
  • Ventilation
  • BMS
  • Plumbing
  • Heating
  • Lighting
  • Power